Pink Aurora Steel Counterweight Boxes being lowered into the bridge towers Bridge span being constructed on land
1400-ton completed bridge span being slowly rolled towards the barge
18-20 axle bridge span transports
Bridge rolling onto the barge
Ballast pump keeping barge level as bridge weight is added Two ballast pumps working
Bridge span almost completely on the barge
The next day, 90-ft wide barge carrying 300-ft bridge span to the channel
Barge with bridge approaching the bridge towers Completed bridge in the down position for railroad crossing Completed bridge in the up position for channel traffic Japan Imperial Palace walls coming out of canal
Parabolic curve of the Imperial walls Relative Size image of Imperial Palace wall corner ashlar blocks Crane sliding a concrete table out of the side of the building
UPS docking bay doors, pre-poured, rigged for lifting Lifting a door--note the crane getting "light" on the back track
A lifted door