Sveriges mest populära poddar

Clean Power Hour

Rooftop Solar Site Selection | Clean Power Hour Ep.2

62 min • 24 april 2021

On this episode of the Clean Power Hour (published July 21, 2020) with co-hosts Tim Montague and John Weaver we discuss site selection criteria for commercial rooftop solar (C&I solar; behind the meter solar PV): roof condition (less than 10 years preferred), available ground if ground mount; electric load vs. available space for solar, grid infrastructure, and how a facility owner will evaluate the opportunity (ROI). John Weaver gives updates on two recent blog posts of his: 1. NREL Operations and Maintenance Costs spreadsheet model; and 2. Massachusetts seeking 100% clean energy.

We love to hear from our listeners so please comment on the podcasts and give us suggestions for topics you would like us to cover. 

Support the show

Connect with Tim

Clean Power Hour
Clean Power Hour on YouTube
Tim on Twitter
Tim on LinkedIn

Email [email protected]

Review Clean Power Hour on Apple Podcasts

The Clean Power Hour is produced by the Clean Power Consulting Group and created by Tim Montague. Contact us by email: [email protected]

Corporate sponsors who share our mission to speed the energy transition are invited to check out https://www.cleanpowerhour.com/support/

The Clean Power Hour is brought to you by CPS America, maker of North America’s number one 3-phase string inverter, with over 6GW shipped in the US. With a focus on commercial and utility-scale solar and energy storage, the company partners with customers to provide unparalleled performance and service. The CPS America product lineup includes 3-phase string inverters from 25kW to 275kW, exceptional data communication and controls, and energy storage solutions designed for seamless integration with CPS America systems. Learn more at www.chintpowersystems.com

Förekommer på
00:00 -00:00