How a new 2.5km cable pulled railway will connect Luton Airport’s terminal to the UK rail network boosting future growth. Today rail passengers arriving at the airport must disembark from the train and finish their journey on a shuttle bus. But not for much longer. Deep sheet piles are currently being driven into the ground...
The post #52 Tunnelling Podcast: Propping up Luton Airport’s new rail link first appeared on Engineering Matters.