Sveriges mest populära poddar

The Future is Electric

TFIE039 CT014: Joi Scientific’s perpetual hydrogen scheme predictably falls apart

14 min • 30 december 2019

New Brunswick Power and through them the rate payers of the province of New Brunswick are out at minimum $13 million spent on an obviously non-viable technology. Their due diligence failed. This is a podcast version of the article of the same name on the TFIE Medium publication.

Kategorier
Förekommer på
00:00 -00:00